Building, Planning and Zoning Department

Main | Contact Info | Construction Guidelines | Permits | Zoning
Planning & Zoning Board | FAQ

Laura Ruckebeil, Director, (847) 872-3846 ext. 268


Shed Construction Quick Facts

Helpful Information for the Construction of a Shed

1. Fill out application for permit (available at Building Dept., Village Hall, or online)

2. A Plat of Survey of your property is to be submitted, indicating where the shed will be located.
(IF ON SEPTIC, you will need a Lake County Property Alteration prior to issuance of a Building Permit)

3. A shed must be located in the rear or side yard and must be a minimum of 10 feet from the house.

4. A setback of 3 feet off the side and rear property lines must be observed.

5. All sheds must be anchored to a 4-inch concrete slab.

6. A drawing of the proposed construction is required.

7. When buying a kit or pre-constructed shed, the manufacturers drawing or instructions will be sufficient.

8. Maximum height of a shed is 18 feet from concrete slab to ridge.

9. Fees:

  • Permit fee is based on the value of the job.
  • Value under $5,000 = $50.00 permit
  • Value over $5,000 = 2% of construction cost. Minimum = $50.00
  • Certificate of Compliance and Occupancy fee of $25.00


Home | Government | Village Clerk | Ordinances | Economic Development
Parks & Recreation | Building & Zoning | Public Works | Police / Fire / EMS
Community Calendar | Newsletter | Resource Links | Village Contacts

Don't see the navigation frame at left? Click here to view the full site!
 
Privacy Statement | Terms of Use
Village of Winthrop Harbor, 830 Sheridan Road, Winthrop Harbor, IL 60096